Case

Professional technical and after-sales service team

SCROLL THE MOUSE

First Quantum Minerals FQM Trident Limited DN750Y rubber-lined pipe

The original pipeline was ceramic-lined. The ceramic lining and adhesive were removed by heating the pipeline, followed by re-rubber lining. Valuable experience was gained in both the process and construction. The product is still in the testing phase, and current performance has been satisfactory.

ADD:NO.318,JingKai Avenue,Shangrao Economic and Technological Development Zone,Shangrao City,Jiangxi Province,China

TEL:400-0793-789

Share

2.807138s